[1]
Rachman, A.P. and Djafar, F. 2022. TINJAUAN PENJADWALAN WAKTU DAN TENAGA KERJA PADA PEKERJAAN REHABILITASI DAN REKONSTRUKSI BERAT JEMBATAN SOKLAT. Jurnal Teknik Sipil, Arsitek, Perencanaan Wilayah (J-TSIAP). 1, 1 (Jan. 2022), 1–20. DOI:https://doi.org/10.37971/j-tsiap.v1i1.49.